MachineryFix

Heinzinger · Excitation & Generator Controls

Heinzinger LNG 50-4 repair

Component-level repair for the Heinzinger LNG 50-4 (power supply, programmable benchtop), onsite or sent in from anywhere in India. The diagnosis and repair cost are confirmed before any work starts.

Cost confirmed before any work starts · Warranty of 30 days to 6 months

At a glance

The Heinzinger LNG 50-4

Manufacturer
Heinzinger
Model / part number
LNG 50-4
Also searched as
LNG504 · LNG 50 4
Description
Power supply, programmable benchtop
Category
Excitation & Generator Controls
Service
Diagnosis and component-level repair, onsite or ship-in
Warranty
30 days to 6 months, confirmed before work starts

Heinzinger equipment in this catalog is listed by model or part number. Send the model from the nameplate and the fault, and it will be matched to an engineer who works on that kind of unit.

Common faults

What usually fails on a unit like the LNG 50-4

Excitation systems and generator controls regulate voltage and protect the generator, so faults show up as unstable voltage, field failures or tripping on load. AVR boards, thyristor bridges, controllers and engine control units can be repaired and tested.

Power section

This is a power part, so it is checked under real load after repair, not just for output voltage at no load. Ageing capacitors and switching devices are replaced as found, since they are the usual cause.

First checks

What to check before calling an engineer

Isolate and lock out the supply, and wait for stored energy to discharge, before opening anything.

Getting it fixed

How to get the LNG 50-4 repaired

What to send with it

  • The AVR, exciter board or controller.
  • The generator rating and the alarm or log.
  • Its settings, if they can be read out.

Onsite or ship-in

Technicians work onsite from our Hyderabad base and travel to plants across India; anything that can be removed can also be sent to MachineryFix from anywhere in the country.

Warranty. Repairs carry a warranty of 30 days to 6 months, depending on the item and the repair; the exact term is confirmed before work starts.

FAQ

LNG 50-4 repair questions

Does the Heinzinger LNG 50-4 need setting up after repair?+

Usually its settings are kept, but voltage regulation and any limits should be checked on the generator when it is refitted.

Does the Heinzinger LNG 50-4 have to be sent in, or can an engineer come to the plant?+

Either. An engineer can diagnose it in place and repair it there or take it away, or the unit can be sent to MachineryFix from anywhere in India. The diagnosis and repair cost are confirmed before any work starts.

Is MachineryFix connected to Heinzinger?+

No. Heinzinger and the model name are used only to identify the equipment. MachineryFix is an independent repair service and is not affiliated with or endorsed by Heinzinger.

Other manufacturers

Excitation & Generator Controls from other makers

Heinzinger and LNG 50-4 are named only to identify the equipment. MachineryFix is not affiliated with or endorsed by Heinzinger.

LNG 50-4 down?

Send the fault and what the machine was doing. We'll match an engineer who works on it.