Control & Power Panels
What we do
We build MCC, PCC, PLC, VFD and APFC panels to order at our Hyderabad facility. Panels are designed around real load and duty data rather than nameplate assumptions, with heat-rise calculations informing enclosure and ventilation choices so the panel survives an Indian summer on a factory floor.
Every panel ships with as-built schematics, a component schedule and test records, so future maintenance does not depend on reverse-engineering the wiring.
Scope
What's covered
- Panel design, GA drawings and schematic development
- Enclosure selection with correct IP and thermal rating
- Busbar sizing, fabrication and torque-controlled assembly
- Component selection and procurement to IS/IEC standards
- Wiring, ferruling and full point-to-point continuity testing
- Factory acceptance testing and as-built documentation
Questions
Electrical Control Panel Manufacturing: common questions
How long does a custom control panel take to build?+
Lead time is driven mostly by component availability rather than fabrication. Standard builds using stocked components move quickly; panels needing imported drives or long-lead switchgear take longer. We confirm a realistic date once the component schedule is approved.
Guides
Related guides
Related
Related services
Written & reviewed by MachineryFix
Last reviewed — questions? Call +91 70133 33007