A special purpose machine is built for one job on one line, so no manual covers it and no other plant has the same one. When it stops, the person who fixes it has to work out what the machine is meant to do before working out what has gone wrong. That is most of SPM repair.
Phone answered 24/7
Call at any hour to report a breakdown.
1 to 12 month warranty
Depends on the repair. The term is confirmed before work starts.
Verified, experienced technicians
Identity checked before a technician is sent to your plant.
Pickup available
A unit that needs bench repair can be collected from the plant.
01 / Faults
What usually stops an SPM
Machine stops mid-cycle
Usually a sensor that no longer sees its target, a clamp or cylinder that does not reach its position, or an interlock that will not make. The PLC's inputs show which step the machine is waiting on.
PLC or HMI fault
A controller in STOP, a lost program after a power cut, or an operator panel that is dark or frozen. On an SPM the program is often the only copy, so it is backed up before anything else.
Drive and motion faults
Servo or VFD alarms on indexing tables, feeds and spindles, often from cabling that flexes with every cycle.
Pneumatic and hydraulic sequence faults
Valves that stick, leak or lose their signal, so a cylinder moves slowly or not at all and the cycle times out.
Obsolete controls
Controllers, drives and panels the builder no longer supports, with no spares and no documentation.
Builder no longer reachable
The company that built the machine has closed or will not support it, and the plant has nothing but the machine itself.
02 / Method
How an SPM fault is found and fixed
- 01Find out what the machine is supposed to do: watch a good cycle if it still runs, or work through the sequence with the operator.
- 02Back up the PLC program, HMI project and drive parameters before any change.
- 03Use the PLC's inputs and outputs to find the step the machine is stuck on, then trace that sensor, valve or drive in the field.
- 04Repair the fault, and mark up the drawings, or draw them where none exist, so the next fault is faster to find.
- 05Run the machine through full cycles with the operator before handover, and leave the backups with the plant.
03 / Modernisation
When the controls are the problem
Many SPMs are mechanically sound but run on relay logic, an early PLC or drives that are no longer sold. Replacing the control side keeps the machine, the tooling and the process the plant has proven, and removes the risk of a breakdown with no spare. The new control system is documented, and the program and parameters are handed over.
04 / Before you call
What to have ready
What the machine makes, the make and model of its PLC, drives and operator panel, any alarm shown, the step it stops at, and whatever drawings or program files exist. Then call or WhatsApp +91 70133 33007; the phone is answered 24/7.
05 / Questions
SPM repair: common questions
Can you work on an SPM with no drawings or program backup?+
Yes. Tracing the wiring and reading the program off the controller is part of the job. Where drawings do not exist, the work done is drawn up so the plant has a record.
Is it better to retrofit an old SPM or replace it?+
If the mechanics are sound and only the controls are obsolete, replacing the PLC, drives and operator panel usually costs far less than a new machine and removes the spare-parts risk. The technician can assess which way makes sense.
Can the cycle time or function of an SPM be changed?+
Often, through changes to the PLC program, drive settings or the pneumatic circuit. Any change to a safety function is done with the machine stopped and checked before handover.
Which SPMs do you work on?+
Assembly, drilling, tapping, welding, pressing, testing and packing machines built for one job, along with the PLC, drive, sensor and panel systems that run them.