Machine downtime cost calculator

What did that breakdown cost? Work it out from your own figures, with its effect on availability. Nothing you enter leaves your browser.

Cost of this stoppage

₹28,600

₹7,150 for every hour the machine was down

Lost marginhours × output per hour × margin per unit
₹16,800
Idle labourhours × idle workers × cost per hour
₹1,800
Repairas entered
₹8,000
Other costsas entered
₹2,000

Availability for the month: 98.1%(planned hours − hours down) ÷ planned hours, counting this stoppage only

01 / Formulas

How to calculate machine downtime

Downtime is the time a machine is stopped when it was planned to run. Its cost is more than the repair bill: the margin on output not made, people paid while they wait, and scrap or overtime afterwards usually cost more than the repair itself.

Downtime (hours)

Time from the machine stopping to it running at normal output again. Include waiting for a technician, for parts and for restart, not only the repair itself.

Downtime %

Downtime hours ÷ planned production hours × 100. Planned hours exclude planned stops such as shift breaks and scheduled maintenance.

Availability %

(Planned production hours − downtime hours) ÷ planned production hours × 100. This is the availability part of OEE.

Cost of downtime

Lost margin + idle labour + repair cost + other costs. Lost margin = hours down × output per hour × margin per unit.

MTTR (mean time to repair)

Total repair time ÷ number of failures in the period. Shows how quickly breakdowns are cleared.

MTBF (mean time between failures)

Total running time ÷ number of failures in the period. Shows how often a machine breaks down.

02 / Example

A worked example

  1. A packaging machine making 120 packs an hour stops for 4 hours.
  2. Each pack earns ₹35 over its material and variable cost, so the lost margin is 4 × 120 × ₹35 = ₹16,800.
  3. Three operators stand idle at ₹150 an hour: 4 × 3 × ₹150 = ₹1,800.
  4. The repair costs ₹8,000 and scrapped film and restart material ₹2,000.
  5. Total: ₹28,600, or ₹7,150 for each hour the machine was down.
  6. With 208 planned hours in the month, availability from this stop alone is (208 − 4) ÷ 208 = 98.1%.

03 / Questions

Downtime: common questions

How do you calculate machine downtime?+

Record the time the machine stopped and the time it was back at normal output, and take the difference. Add up these stoppages over the period. Downtime % is the total divided by the planned production time, times 100. Planned production time leaves out planned stops such as breaks and scheduled maintenance.

Should lost production be valued at the selling price?+

No. Use the margin per unit: the selling price minus material and other costs that are not spent when the machine is stopped. Using the full selling price overstates the loss. If the lost output is made up later with overtime, count the overtime cost instead of the lost margin.

What is the difference between downtime and availability?+

They are two sides of one figure. Downtime % is the share of planned time the machine was stopped; availability % is the share it was able to run. A machine down 4 hours out of 208 planned hours has 1.9% downtime and 98.1% availability.

What counts as downtime: only repair time?+

No. Count from the stop to normal output: noticing the fault, finding someone, waiting for parts, the repair, and restarting. Repair is often the shortest part. Separating these times shows whether faster diagnosis, spares on the shelf or a maintenance contract would cut the most.

How can downtime be reduced?+

Find out which machines and which faults cause most of it, then act on those: planned maintenance for failures that give warning, spares and program backups for failures that do not, and quicker access to a technician who knows the equipment. A record of each stoppage per machine is what makes this possible.