Breakdown & Maintenance
What we do
An annual maintenance contract (AMC) turns maintenance from a string of emergency calls into planned work. The machines that matter are listed, each gets a schedule of checks, and the visits happen whether or not something has failed. Breakdowns on those machines are still attended, and a plant under contract is attended ahead of one-off requests.
The contract is written around your plant, not picked from fixed packages. A walk-through first lists the machines, their condition and their breakdown history; the scope, the number of visits and the price follow from that list, and you approve them before the contract starts. What is covered and what is quoted separately, such as major parts, is stated in writing.
The work done under the contract is the same preventive and predictive maintenance described on that service page. What the contract adds is continuity: the same record of each machine builds up visit after visit, so the next technician starts from its history instead of from nothing.
By equipment
AMC by equipment
Scope
What's covered
- Planned preventive visits on a schedule agreed for your machines
- Breakdown calls from contract plants taken ahead of one-off requests
- Program and parameter backups of PLCs, drives, HMIs and CNC controls
- Readings on critical machines: vibration, temperature, insulation and current
- Every visit and repair logged against the machine in your service record
- A critical-spares list for the machines the contract covers
Failure modes
How annual maintenance contract (AMC) for industrial machines faults usually show up
The same fault, again
A drive that trips every few weeks or a PLC that loses its program each power cut is usually being reset, not fixed. A contract gives someone the job of finding the cause.
No backup when it matters
A failed PLC, HMI or CNC control with no saved program can stop a machine for weeks. Backups are taken on the first visits and refreshed after every change.
Nobody knows what was done last time
When repairs are done by whoever was available, the history lives in people's heads. Under a contract every visit is written against the machine.
Maintenance that slips
In-house checks get postponed when production is busy, which is exactly when a failure costs most. Contract visits are dated in advance and fitted to your planned stops.
First checks
What you can check first, and what needs a specialist
Safe for a plant electrician
- Keep a dated log of every alarm, trip and stoppage, even ones that clear on reset.
- Clean panel filters and check that panel and drive fans are turning.
- Check that the last program and parameter backups are where you think they are.
- Note any new noise, heat or vibration on motors and gearboxes.
Needs lockout or a specialist
- Program and parameter backups from PLCs, drives, HMIs and CNC controls.
- Thermal imaging, vibration analysis and insulation testing.
- Work inside live panels, and re-torquing of power terminations.
- Replacement of drive capacitors, fans and control batteries.
Local conditions
In Hyderabad plants
Visits are planned around Hyderabad's seasons: cooling and ventilation before the April to June heat, enclosure seals, heaters and earthing before the monsoon.
Plants in dusty estates near cement, stone and textile units need shorter cleaning intervals than the manuals suggest, and the schedule is set from what your panels actually collect.
Contracts are written for plants in and around Hyderabad's industrial areas. For plants elsewhere in India, send the machine list and location and we will say what can be covered.
Before the visit
What to have ready before the technician arrives
- 01List the machines you want covered, with make and model where you know them.
- 02Mark the ones that stop production when they fail.
- 03Collect whatever breakdown and repair history exists, even invoices or a logbook.
- 04Note your shift pattern and planned shutdowns, so visits can be timed around them.
Verification
How the repair is checked before handover
- The first walk-through produces a written machine list and scope that you approve before the contract starts.
- Each visit ends with a report of what was checked, what was found and what was done.
- Findings carried over from earlier visits are closed or re-dated, not dropped.
- The scope is reviewed at renewal against what actually failed during the year.
Parts
Boards and parts commonly involved
- Panel filters, fans and cooling components
- Backup batteries in PLCs, HMIs and CNC controls
- Contactors, relays and terminations
- Drive fans and capacitors nearing end of life
- Bearings, belts and couplings on covered machines
Job card
What the job card records
- Machines covered by the contract
- Checks and readings taken on the visit
- Faults found and work done
- Parts fitted and parts recommended
- Open items and the date they are planned for
Questions
Annual Maintenance Contract (AMC) for Industrial Machines: common questions
What does an AMC usually cover?+
Scheduled preventive visits, the checks and readings agreed for each machine, backups of programs and parameters, and labour for attending breakdowns on the covered machines. Parts are normally quoted separately when they are needed, unless the contract says otherwise. The exact scope is written into the contract before it starts.
How is an AMC priced?+
From the machines covered: how many, what type, their condition and how often they need attention. There is no fixed price list, because a contract for six CNC machines and one for a packaging line are different amounts of work. You get a written quote after the first walk-through.
Do you promise a response time or uptime figure?+
Breakdown calls from contract plants are prioritised over one-off requests. A fixed response time is only written into a contract when it has been agreed for that plant and its location; it is not a blanket promise, and no uptime percentage is guaranteed, because uptime also depends on how the machines are run.
Can the contract cover machines of different makes?+
Yes. A single contract can cover the PLCs, drives, HMIs, CNC controls and panels on mixed makes of machine. Technicians are matched to the equipment, so the person attending a Fanuc control is someone who works on Fanuc controls.
We only have a few machines. Is an AMC worth it?+
It depends on what a stoppage costs you. For a small unit with one machine that everything depends on, a light contract covering that machine can be worth more than one covering twenty robust ones. If your machines rarely fail, paying per repair may be cheaper, and we will say so.
How many visits are there in a year?+
As many as the machines need, agreed at the start. A plant with critical CNC machines running three shifts needs more visits than one with a few robust machines on a single shift. The number is written into the contract.
What is the difference between an AMC and paying per repair?+
Paying per repair means someone comes when a machine has already stopped. An AMC adds planned visits meant to stop that happening, priority when it does, and a continuous record of each machine. For machines that rarely fail, paying per repair can be the cheaper choice.
Can we start with a few machines and add more?+
Yes. Many plants start with the machines that hurt most when they stop and extend the contract at renewal once they have seen how it works.