When an HMI dies, the panel itself is rarely the hard part; the missing project file is. When a SCADA PC fails, the licence, the drivers and the latest archive go with it. A SCADA and HMI AMC keeps tested backups of all of it, watches the PC before it fills up or wears out, and checks that operators still see what the PLCs are doing.
The contract covers the HMIs and SCADA stations you list, of any make, and every visit is written against them in your service record.
Phone answered 24/7
Call at any hour to report a breakdown.
Verified, experienced technicians
Identity checked before a technician is sent to your plant.
01 / Each visit
SCADA and HMI preventive maintenance: what each AMC visit covers
HMI project backup
The HMI project, recipes and alarm configuration are saved on the first visit and after every change, together with the software version needed to open them.
Restore test
Where a spare panel or a test PC is available, a backup is restored to prove it works. A backup that has never been restored has not been tested.
Touch screen and display
Touch response, calibration and backlight brightness are checked, so a dimming backlight or a dead touch zone is dealt with before operators can no longer use the panel.
SCADA PC health
Disk space, disk health, event logs and memory are checked, and the PC's own backup or disk image is kept current.
Licences and keys
Licence files, dongles and authorisations are recorded with their serial numbers, so the licence can be moved or recovered when a PC fails.
Communication
Driver status and communication errors between SCADA, HMIs and PLCs are reviewed, and time sync is checked so alarms and logs carry the right time.
Historian and logging
Database size, archive rotation and gaps in the data are checked, so logging does not stop when a disk fills up.
Power and UPS
The UPS for SCADA and server PCs is tested, and HMI clock batteries are checked where the panel uses one.
02 / Why
What a SCADA and HMI AMC prevents
HMI replaced, project missing
A dead panel with no project file can stop a machine for weeks. A tested backup turns it into a swap.
Causes & checks →SCADA stops logging
A full disk or a stalled archive, checked on every visit.
Licence lost with the PC
Recorded licence details and a current disk image make a PC failure a rebuild instead of a hunt for keys.
Operators see stale data
Communication errors that freeze values on screen without an obvious alarm, found in the driver diagnostics.
03 / Records
What is kept for every system
- HMI and SCADA project backups, with dates and software versions
- Licence serial numbers, dongles and where they are installed
- HMI models, firmware and spare panel availability
- SCADA PC specifications, disk health and image dates
- Faults found and work done on each visit
04 / How it works
How a SCADA and HMI AMC is set up
Contracts are written for plants in and around Hyderabad's industrial areas. For plants elsewhere in India, send the equipment list and location and we will say what can be covered.
- 01Send the list of equipment you want covered and where the plant is.
- 02A walk-through records each unit, its condition and its breakdown history.
- 03You get a written scope, the number of visits and a quote, and approve them before the contract starts.
- 04Visits happen on the agreed dates and each ends with a report. Breakdowns on covered equipment are attended ahead of one-off requests.
- 05At renewal the scope is reviewed against what actually failed during the year.
Makes
SCADA and HMI makes we work on
Questions
SCADA & HMI AMC: common questions
What does a SCADA and HMI AMC include?+
Scheduled visits with project backups, restore tests where a spare is available, SCADA PC and historian checks, licence records and communication checks, plus labour for attending breakdowns on the covered systems. Hardware and licences are normally quoted when they are needed, unless the contract includes them.
Which HMI and SCADA software is covered?+
Common packages such as Siemens WinCC and the HMI and SCADA software of Allen-Bradley, Schneider, Mitsubishi, Delta and ABB, on panels and PCs of mixed makes. Each visit goes to a technician who works with that software.
Can an HMI project be recovered if we have no backup?+
Sometimes. Many panels allow the project to be uploaded, if that was not disabled when it was loaded. If it cannot be uploaded, the screens have to be rebuilt, which is why the AMC takes a backup on the first visit.
How often should SCADA systems be checked?+
Backups are taken after every change, and PC and historian checks happen at the interval agreed for the plant. A SCADA system running a continuous process is usually checked more often than an HMI on a single machine. The number of visits is written into the contract.